SOLUTION
By specifying our structural waterproofing Permatec it is laid directly onto the concrete slab and by doing this you can eliminate wet trades and save on time and money throughout the project. Also, by laying the membrane to shallower falls it gives greater stability to the tile Jack system.
Asphaltech was involved early in the design stage to elevate any design issues. Working through the design process allowed us to select the most suitable products and systems for the balcony areas and lower podium.