Northbridge Retirement Village

The project architects Klein looked for an option where the waterproofing membrane was totally level making the installation of the pedestals easier and more reliable. This was due to having some previous issues with the tiles rocking on a torch on membrane system with laps.

ArchitectKlein
ContractorCMP
Date2019
SystemPodium Terrace System
Size2200 m2

SOLUTION
Pacoflex Mastic Asphalt was chosen for monolithic characteristics leaving a total level, seamless surface for the pedestal system to rest on flat.

Asphaltech was involved early in the design stage to elevate any design issues. Working through the design process allowed us to select the most suitable products and systems for the balcony areas and lower podium.

Asphaltech solution

Extremely strong, durable and can be easily formed/molded to complex shapes the premium Podium system is perfect for modern construction. In its malleable state, when hot, it allows a full range of surface finishes from the mastic asphalt wearing layer, which can be stamped with patterns, coloured or just smooth flat providing a stable base for overlaying various surface finishes from the pavers on pedestals systems to simple decorative pebbled surfaces.

System used

Podium Terrace System

Podium Terrace System

Recent Projects